Silver Storm drills 436 g/t Ag.Eq over 4.5 m, approximately 97 m under last stope in Norte-Sur Zone

Toronto, Ontario, November 21, 2023: Silver Storm Mining Ltd. (“Silver Storm” or the "Company") (TSX.V: SVRS | OTCQB: SVRSF | FSE: SVR), is pleased to announce the second set of drill results from its Phase 1 diamond drilling program at the Company’s 100% owned La Parrilla Silver Mine Complex, located in Durango Mexico. Results from the two holes within this release are from the Quebradillas mine.

Key highlights include:

• Hole Q-23-007 successfully intersected the Norte-Sur zone returning 436 g/t Ag.Eq1 over 4.46 metres (“m”) and 330 g/t Ag.Eq over 2.26 m within a broader interval grading 324 g/t Ag.Eq over 8.72 m.

• This intercept is located approximately 97 m below the last mine development in this area, with similar high-grade mineralization:

- Level 1749 graded 358 g/t Ag.Eq over a strike length of 51 m and width of 3.6 m

- Level 1737 graded 407 g/t Ag.Eq over a strike length of 28 m and width of 3.2 m

• Hole Q-23-007 also successfully intersected a new zone returning 357 g/t Ag.Eq over 1.77 m, including a strong gold intercept of 4.07 g/t Au.

• Hole Q-23-006 successfully intersected a new zone of replacement mineralization returning 1,085 g/t Ag.Eq over 0.82 m and 633 g/t Ag.Eq over 0.44 m.

Previous
Previous

Silver Storm To Present At The Clean Energy AND Precious Metals Virtual Investor Conference

Next
Next

Silver Storm To Attend 121 Mining Investment London Conference